Installation Overview At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://top10bookmark.com/story20577239/advanced-400-kw-chiller-installation-delivers-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut