Was there almost nothing within the deal about offering a list of "as-created" drawings at the end of construction? didn't the contractor preserve a marked-up list of prints inside their occupation trailer/Workplace to file development deviations from the construction files? looks fairly standard to me which is designed to resolve https://archerlpuxd.ssnblog.com/33142772/top-dwg-secrets