The initial park has a capability of two hundred MW though Sandrini II includes a potential of a hundred MW. The total cost of equally jobs weren't disclosed however, for the duration of building, in excess of 200 employees had been employed. The projects are envisioned to discover a handful https://bestsolarinstallationcompanycalifornia.sport.blog/2024/09/13/4-tips-to-hire-the-best-commercial-solar-contractors/